PROJECT |
CLIENT |
CONSULTANT |
CONTRACT
PERIOD |
CONTRACT
VALUE(AED) |
| 1 |
Headquarters
Building for Ministry of Labour * |
Client:
Emirates Real Estate Corp. |
Khatib
& Alami |
70
days |
2,640,00 |
| 2 |
B+G+M+43
Tower for M/s. Dubai Islamic Bank on
Plot No. 392-195, Marsa Dubai * |
Client:
Dubai Islamic Bank |
Design
ARchitecture bureau |
120
days |
11,750,000 |
| 3 |
Al
Fattan Towers(3B+G+48)Diaphragm Wall
Shoring (426 LM) |
Client:
Al Fattan Properties |
Norr
Group Consultants International Ltd. |
120
days |
10,000,000 |
132,000
m3 |
14.5
m |
| 4 |
Hotel
& Serviced Apartments for H.H. Sheikh
Ahmed Bin Saed Al Maktoum (3B+G+48)Diaphragm
Wall Shoring (360 LM) |
Client:
H.H. Sheikh Ahmed Bin Saeed Al Maktoum |
Archon
Architects, Planners, Engineers, Interior
Designers |
195
days |
18,000,000 |
125,000
m3 |
14
m |
| 5 |
Headquarters
Building for Ministry of Public Works
and Housing(282 LM) |
Client:
Emirates Real Estate Corp. |
Hill
International |
72
days |
1,578,460 |
42,750
m3 |
1.2
m |
| 6 |
Marina
Heights Tower for Mr.Abdul Salam on
Plot N0.392 200 at Dubai Marina * |
Project
Managers: RMJM |
|
|
6,650,000 |
| 7 |
G+5P+HCFI+33
Building for Mr. Al M. Alnaqbi on Plot
No. 522 at Al Majaz in Sharjah * |
Ali
Moosa & Sons Contracting |
Gulf
International |
60
days |
583,000 |
| 8 |
Dubai
International Airport Expansion Phase
II * |
Al
Naboodah Contracting Co. |
Dar
Al Handasah / ADPi Joint Venture |
|
45,000,000 |
| 9 |
3B+G+38
Building for Mr. Mohammed Abdullah Sayah
* |
Al
Shafar Gen. Contg. Co. |
National
Engg. Bureau |
90
days |
4,800,000 |
| 10 |
G+5P+HCFI+33
Building for Mr. Ali Moosa on Plot No.
552 at Al Majaz in Sharjah * |
Ali
Moosa & Sons Contg. |
Gulf
International |
60
days |
Piling-518,080Shoring-40,000 |
| 11 |
G+15
Building for Mr. Abdulaziz Mohd. Al
Majid on Plot No. 309 at Al Ghweer in
Sharjah * |
Abdulaziz
Mohd. Al Majid Est. |
Al
Turath Engg. Cons. |
30
days |
400,000 |
| 12 |
G+12
Building for Mrs. Fatmah Hemdan Rashid
Bin Khadem on Plot No. 1109 at Al Nabah
in Sharjah * |
Sharcon
Contg. Co. |
Gececo |
31
days |
340,000 |
| 13 |
Dubai
Marina Development Plots 6, 7, 8 & 9
(secant piles) * |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
|
9,158
per RM |
| 14 |
Jumeirah
Beach Residence (Trial Trenches) |
Project
Mngmnt: Turner International |
Client:
Jumeirah Beach Residence |
7
days |
750
per Trial Trech |
| 15 |
4
Nos. T2 Type and 3 nos. T2A Type Apartment
Buildings at Emirates Hills |
Al
Shafar Transport & Contg. Co. |
Client:
Emaar Properties PJSC |
30
days |
1,200,000 |
| 16 |
B+G+4
Commercial / Residential Building on
Plot No. 314-722 at Umm Hurair First
in Dubai |
Client:
Mr. Nasir Ahmad Nasir Lootah |
Design
ARchitecture bureau |
61
days |
1,480,000 |
| 17 |
Dubai
Marina Development Plot 7Y2 |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
116
days |
2,878,894 |
| 18 |
Dubai
Marina Development Plot 7Y1 |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
53
days |
1,152,012 |
| 19 |
Dubai
Marina Development Plot 4F |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
44
days |
913,173.52 |
| 20 |
Dubai
Marina DevelopmentPlot 4H |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
47
days |
828,282.18 |
| 21 |
Dubai
Internet City P-052 (2B+G+4)Diaphragm
Wall Shoring (480 LM) |
Client:
Dubai Internet City |
Design
ARchitecture bureau |
120
days |
7,136,248 |
470,000
m3 |
9.0
m |
| 22 |
Dubai
Marina DevelopmentBridges 2 and 3 |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
68
days |
8,746,375 |
| 23 |
Dubai
Marina DevelopmentPlot 4E |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
65
days |
1,785,126 |
| 24 |
Dubai
Marina DevelopmentPlot 4G1 |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
42
days |
832,986.24 |
| 25 |
Headquarters
Building for Ministry of Public Works
and Housing (282 LM) |
Client:
Emirates Real Estate Corp. |
Hill
International |
72
days |
1,578,460 |
42,750
m3 |
1.2
m |
| 26 |
Dubai
Knowledge Village for M/s. Dubai Internet
City (1557 LM) |
Client:
Dubai Internet City |
Design
ARchitecture bureau |
210
days |
6,538,617 |
120,000
m3 |
4.5
m |
| 27 |
Dubai
Marina DevelopmentPlot 4G2 |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
55
days |
1,414,874 |
| 28 |
Dubai
Marina DevelopmentPlot 7Y Secant Piles |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
45
days |
1,249,800 |
| 29 |
Dubai
Marina DevelopmentPlot 4EFGH (Podiums) |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
31
days |
641,800 |
| 30 |
Dubai
Marina DevelopmentPlot 6A |
Client:
Emaar Properties PJSC |
Hyder
Consulting Middle East Ltd. |
31
days |
1,058,310 |
| 31 |
4
Residential Buildings at Dubai Media
City |
Ascon |
Dubarch |
37
days |
466,750 |
| 32 |
Leo
Burnett Building at Dubai Media City |
United
Engineering Const. (UNEC) |
Dubarch |
16
days |
316,900 |
| 33 |
Dubai
Convention CentreRoad Works and Landscaping |
Dutco
Balfour Beatty |
R.M.J.M. |
19
days |
157,800 |
| 34 |
Emirates
Hills PA 10 Apartment Buildings (Additional
4 Buildings) |
Client:
Emaar Properties PJSC |
Al-Hashemi
Architect, Engineers, Planners |
36
days |
2,212,928 |
| 35 |
Emirates
Hills PA10 Office Buildings (Additional
Piles) |
Client:
Emaar Properties PJSC |
Norr
Group Consultants International Ltd. |
4
days |
175,000 |
| 36 |
Emirates
Hills PA 10 Apartment Buildings (14
Buildings) |
Client:
Emaar Properties PJSC |
Al-Hashemi
Architect, Engineers, Planners |
114
days |
7,352,289 |
| 36 |
Dubai
Convention Centre Shard Building |
Khansaheb
Civil Engineering |
R.M.J.M. |
36
days |
533,960 |
| 37 |
Al
Habtoor Residential TowersPlot B14/1
in Sharjah |
Sun
Engineering & Contracting Co. |
Technical
Studies bureau (TEST) |
205
days |
3,900,000 |
| 38 |
Madinat
Jumeirah Port of Entry Hotel |
Project
Mngrs.: Mirage Mille & Leisure Development |
Al
Burj Engineering Consultants |
50
days |
2,342,561 |
|
|
| 39 |
U.A.E.
Ministry of Education Complex in Dubai |
Client:
EREC |
Project
Managers: Turner Intl. |
70
days |
859,375 |
|
|
| 40 |
Al
Murooj Complex on Plot No. 336-234 at
Community Trade Center 2nd in Dubai(300
LM) |
Client:
Dubai International Real Estate |
Architecture
& Engineering Consultants |
120
days |
9,278,530 |
57,000
m3 |
1.2
m |
| 41 |
Emirates
Hills PA 10 Residential Buildings |
Client:
Emaar Properties PJSC |
Al-Hashemi
Architect, Engineers, Planners |
65
days |
708,929 |
|
|
| 42 |
Dubai
Festival City Test Piles |
Project
Managers: Turner International |
Rice
Perry Ellis, Hyder Consulting |
35
days |
228,500 |
|
|
| 43 |
G+M+35+HC+HP
Building on Plot No. 557 (Mulk) at Al
Mamzar in Sharjah for Mr. Abdul Aziz
Al Majid |
Abul
Aziz Mohd. Al Majid Est. |
Eng.
Adnan Saffarini |
25
days |
950,000 |
|
|
| 44 |
Dubai
Media City Phase III / P-042 |
Client:
TECOM |
Schuster
Pechtold & Partners |
60
days |
1,816,080 |
|
|
| 45 |
Emirates
Hills PA10 Office Buildings (4 Buildings) |
Client:
Emaar Properties PJSC |
Norr
Group Consultants International Ltd. |
56
days |
1,678,956 |
|
|
| 46 |
21st
Century Tower Project at Sheikh Zayed
Road in Dubai |
Client:
Al Rostamani Group |
WS
Atkins & Partners Overseas |
60
days |
2,800,000 |
|
|
| 47 |
Emaar
Headquarters Project in Dubai (2B+G+20)Diaphragm
Wall Shoring (282 LM) |
Client:
Emaar Properties PJSC |
Norr
Group Consultants International Ltd. |
115
days |
2,172,387 |
65,000
m3 |
11
m |
| 48 |
G+3+SF+26+2PH
Building on Plot No. 393 at Al Majaz
in Sharjah for M/s. Nemah Ali Guloom
Ridah & Partners |
Engr.
Hani |
Ajyad
Engineering Consultants |
40
days |
650,000 |
|
|
| 49 |
B+G+15
Building on Plot No. 481 at Al Nahda
in Sharjah for Mr. Abdul Latif Abdullah
Humaid Al-Shiba (2 buildings) |
Al
Mezan Contracting Co. |
Al
Turath Engineering Consultants |
20
days |
350,000 |
|
|
| 50 |
2B+G+5
Building (Finance, I.T. and Audit Dept.)
on Plot No. 312-1163 at Suq Al Kabeer
in Dubai for H.H. Rulers Court, Government
of Dubai |
Al
Nekhreh Contracting Co. |
Arif
and Bintoak |
30
days |
840,000 |
|
|
| 51 |
G+5P+SF+34+PH
Building on Plot No. 624 at Al Majaz
in Sharjah for Dr. Sheikh Faisal Al
Qassimi |
Best
Building Company |
Gulf
International Consultants |
45
days |
725,000 |
|
|
| 52 |
Al
Jaber Complex Car Park Building and
additional variation works (2B+G+48)
(216 LM) |
Al
Habtoor Murray & Roberts J. V. |
Norr
Group Consultants International Ltd. |
30
days |
930,000 |
40000
m3 |
10.5
m |
| 53 |
G+3
Comm. / Res. Building on Plot No. 318-840
at Al Karama in Dubai for Mr. Abdul
Salam Mohd. Rafi |
Belhasa
Engineering & Contracting Co. |
Design
ARchitecture bureau |
36
days |
390,000 |
| 54 |
Dubai
Media City Phase IIOffice Buildings |
Dubai
Media City |
Schuster
Pechtold & Partners |
42
days |
1,970,378 |
| 55 |
Al
Jaber Complex (Shangri-La Hotel) on
Plot. 335-119 at Sheikh Zayed Road in
Dubai |
Mace
International |
NORR
Group Consultants |
25
days |
260,000 |
| 56 |
B+G+6
Building on Plot No. 64 al Nahda in
Sharjah for Mr. Emad Abdul Hadi Al Hashimi |
Construction
& Reconstruction Engineering Company
(CRC) |
Ewan
Engineering Consultants |
34
days |
570,000 |
| 57 |
B+G+M+3
Comm. / Res. Building on Plot No. 314-0714
at Umm Hurair in Dubai for Mr. Khalid
Abdul Rahim Ahmad Abdul Rahim Al Attar |
Belhasa
Engineering & Contracting Co. |
Eng.
Adnan Saffarini |
26
days |
430,000 |
| 58 |
Dubai
Internet City Headquarters Project
with Fencing Work |
Dubai
Internet City |
Arenco |
30
days |
2,790,825 |
| 59 |
Al
Jaber Complex (Shangri-La Hotel) on
Plot. 335-119 at Sheikh Zayed Road in
Dubai |
Mace
International |
NORR
Group Consultants |
62
days |
4,850,000 |
| 60 |
G+4Parking+30
storey building on Plot No. 881 at Al
Majaz in Sharjah for Mr. Mohammad Abdulla
Sayyah |
Tiger
Contracting Co. |
High
Art Engineering Consultants |
32
days |
1,050,000 |
| 61 |
Dubai
Internet City, Phase 1B & 2B at Sheikh
Zayed Road in Dubai for M/s. Dubai Internet
City |
Dubai
Internet City |
DAR
Consultants |
60
days |
1,681,981 |
| 62 |
G+M+3
Comm./Res. Building on Plot No.134-817
at Al Memzar in Dubai for Mr. Mohammed
Abdullah Al Gurgawi |
Al
Hudaiba Contracting |
Group
ConsultIntl. |
24
days |
300,000 |
| 63 |
Car
Ports for Dubai Internet City, Phase
II at Sheikh Zayed Road in Dubai |
Rasana
Engg. Ind. Co. Ltd. |
Cansult |
12
days |
145,000 |
| 64 |
B+G+1
Shopping & Leisure Complex on Plot No.
332-1174 at Jumeirah in Dubai |
Transemirates
Contracting |
Cowi
Al Moayed |
36
days |
2,600,000 |
| 65 |
Dubai
Internet city Phase IIn Dubai |
Al
Habtoor Engineering Enterprises |
W.S.
Atkins & Partners |
25
days |
261,120 |
| 66 |
Dubai
Airport Free Zone Offices Phase
II in Dubai dor Dubai International
Airport |
Al
Habtoor Engineering Enterprises |
Rice
Perry Ellis |
18
days |
480,000 |
| 67 |
B+G+15
building on Plot No. 19(Mulk) at Al
Mamzar Block in Sharjah for Mr. Humaid
Abdulla Humaid Al Sheeba |
Abdul
Humaid / Abdul Latif Al Sheeba |
Al
Turath Engg. Consultants |
25
days |
1,060,000 |
| 68 |
West
Side Marina, Phase I in Dubai for
M/s. Emaar Properties PJSC(Piling
Designed by Middle East Foundations
Group) |
Parsons |
Hok
Canada /Mott MacDonald |
120days |
19,800,000 |
| 69 |
Prop.B+G+M+5
Government Garage Res. Building on Plot
No. B-27 at Umm Hurair in Dubai for
M/s. Government Garage |
Bu
Haleeba Contracting |
ARENCO |
28
days |
750,000 |
| 70 |
2B+G+M+9
Building on Plot No. P-207/1 at Regga
Al Buteen in Dubai for Mr. Sultan Bin
Ali Al Owais |
Al
Nekhreh Contracting |
The
Fraser Nag Partnership |
12
days |
500,000 |
| 71 |
G+M+12
Building on Plot No. 92 at Al Nahda
in Sharjah for Mr. Ehsan Waleed Khiyami
& Hussam Mohd. Al Khiyami |
Ali
Moosa & Sons Contracting |
Dr.
M.Al Azhari |
29
days |
600,000 |
| 72 |
G+26
building on Plot No. 594 at Al Majaz
in Sharjah for Mr. Abdul Aziz Al Majid |
Abdul
Aziz Al Majid Est. |
Al
Turath Engg. Cons. |
31
days |
950,000 |
| 73 |
Dubai
Internet City Enterprise Building,
Phase II at Umm Saqeem in Dubai |
Bu
Haleeba Contracting |
NORR
Group Consultants |
15
days |
575,000 |
| 74 |
Dubai
Internet City Enterprise Building,
Phase I at Umm Saqeem in Dubai for
M/s. Dubai Internet City |
Dubai
Internet City |
W.
S. Atkins & Partners |
30
days |
1,750,000 |
| 75 |
G+12
Building on Plot No. 722 at Al Khanin
Sharjah for M/s. Seven stars Real Estate |
Sevens
Stars Contracting |
Al
Sarab Consultants |
28
days |
430,640 |
| 76 |
G+M+
3 Comm/Residential Building on Plot
no. 343-873 at Sheikh Zayed Road in
Dubai for Sheikh Mohd. Bin Hasher Al
Maktoum |
Al
Nekhreh Contracting |
Sharafi
PHB |
27
days |
446,040 |
| 77 |
B+G+3
building on Plot No. B-1660 at Al Ghusais
in Dubai for Mr. Ismail Abdullah Al
Quarqawi |
Ahmed
Bin Dasmal Contracting |
Arabesque
Consultants |
16
days |
330,000 |
| 78 |
G+2P+20
Building on Plot No. 497 at Al Majaz
in Sharjah for Mr. Awad Ahmad Al Jazairi |
Al
Jazairi Readymix (Jamix) |
Gulf
International |
45
days |
300,000 |
| 79 |
G+12
Building on Plot No. P-664 at Al Majaz
in Sharjah for H.H. Sheikh Rashid Bin
Saqar Bin Rashid Al Qassimi |
Arabian
Contracting Co. |
Al
Gurg Engg. Cons. |
21
days |
300,000 |
| 80 |
G+6
Building on Plot No. 1037 at Abu Shagara
in Sharjah for Mr. Ahmad Abdulla Almihyas
& Ahmad Salih Almulla |
Tiger
Contracting |
Al
Zarwa Engg. Cons. |
32
days |
305,000 |
| 81 |
G+13
Building on Plot No. 500-503 at Al Mamzar
in Sharjah for H. E. Ali Al-Noman &
Ahmed Al Fardan |
Al
Kauther Contracting |
Emirates
Design Consortium |
32
days |
650,000 |
| 82 |
Cable
Car Project at Al Khor Park (Creek Side)
in Dubai for M/s. Dubai Municipality |
Al
Mashriq Archt. & Const. Co. |
Adnan
Saffarini |
|
650,000 |
| 83 |
2B+G+M+3
Building on Plot No. B-125 at Umm Hurair
in Dubai for Mr. Ibrahim Hussain Al
Sayegh |
Al
Mashriq Archt. & Const. Co. |
Emirates
Design Consortium |
45
days |
1,115,000 |
| 84 |
Dubai
Airport Access Roads & Parking |
Dutco
Balfour Beatty |
De
Leuw Cather Overseas |
|
819,000860,000 |
| 85 |
Proposed
Res. & Commercial Building on Plot No.
P-281 at Al Hamriya in Dubai |
Union
Properties |
Design
& Architecture Cons. |
70
days |
1,350,000 |
| 86 |
B+G+7
Building on Plot No. 339/1 at Al Raffa
in Dubai for Mr. Saeed Matar Saeed Belaila |
Saleh
Constructions |
Design
& Architecture Cons. |
25
days |
520,000 |
| 87 |
G+2P+18
Building on Plot No. 607 at Al Majaz
in Sharjah for Mr. Saleem Arafat Al
Bayed |
Al
Rukn Bldg. Contracting |
Gulf
International |
28
days |
445,000 |
| 88 |
Cable
Car Project at Al Khor Park(Creek Side
Park) in Dubai for Dubai Municipality |
Al
|